Sample Project

22.6.2020

Dismantling interior walls

10.8.2020

Massive skeleton works and constructions

2.9.2020

Ruins of original structure

21.9.2020

Perform negative sealing and first row of blocks

23.9.2020

Lifting walls and construction

19.10.2020

Installation of blind lintels of windows and openings

16.11.2020

Air conditioning installations

23.11.2020

Continue piping, electricity and gas and completion Air conditioning

27.11.2020

Gravel dispersal and underfloor heating layout

24.12.2020

Closing plaster

5.1.2021

Continuing electrical 

24.1.2021

Lowering Plaster

7.2.2021

Continuation of Plaster work

9.3.2021

Painting walls